Basic Info.
Packaging & Delivery
To be negotiated ( > 10 PCS)
Product Description
3500W Dry Ice Machine Stage Effect Low Lying Fog Machine for Wedding Events DJ Stage Show
pecification
- Voltage: AC110V / 220V, 60Hz / 50Hz
- Power: 6000w
- Heat-up Time: 15 mins (20 mins for 110V)
- Electronic Temperature Control: 70-80
- Control Model: Manual
- Water Consumption: 20L up to water line
- Max Continuous Output: 3-4mins
- Max Output Coverage: 50-100 square meter
- Materials: Dry ice and water
- Machine Size: 42x36x40cm
- Package Size: 49x49x47cm
Advantage
-
Simple and easy operation
-
Adjustable control handle to medium position and a low position to make abundant output.
-
Install temperature sensor. When the water reaches 85 or there is low-water, the temperature sensor automatically shuts off heat to ensure safety.
-
customized patented product.
Packing List
- 1pc Dry ice fog machine
- 1pc User manual
- 1pc 3M Hose
FAQ
Q: Are you a factory or trading company?
A: We are manufacturer with export qualification, provide competitive factory price.
Q: How to get the latest price?
A: If you want the latest price, Please email or call us with the items names or No. and your needing quantity you are interested in, or send us your inquiry at the bottom of the product page.
Q: Do the products have any certificate?
A: Yes, our products have CE and ROHS EMC and LVD certification, please contact us if you need other certifications.
Q: How to place an order?
A: Please kindly send us your order by email, we will confirm the quotation with you. We wish to know the information: delivery information (name, company, address, zip code, mobile/telephone number, transportation way) and production information (product details, order quantity, customized logo or not, etc.)
Q: Can you help me to print our logo or company name on the products or package?
A: Of course yes, OEM&ODM order is warmly welcomed.we have our laser printing machine
Q. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks according to order quantity
Q. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional